Publication: Building Design

Publication: Building Design, issue 1669 18th November 2005

“The studios are a response to a homeowners’ demand for additional living or work space without the inconvenience of building a traditional house extension.” The challenge: To reduce on site build time for fast–track prefab studios the solution: Devise an adjustable bearing to support the floor.” Working with our engineers we engineered an eco-friendly solution.

Posted On: November 18th, 2005


Return to News